From idea to installation

    Seven clear steps.
    One coordinated process.

    Prefab construction works best when design, engineering, production and installation are coordinated from the start.

    1. 01

      Intake and feasibility

      We discuss your wishes, budget, home and planning constraints.

    2. 02

      Design

      Dimensions, layout, facade, roof and technical choices are made explicit.

    3. 03

      Permit route

      We check whether a permit is needed and prepare the route when required.

    4. 04

      Factory production

      Main elements are engineered and produced before installation.

    5. 05

      Site preparation

      Foundations, connections and access are prepared for the modules.

    6. 06

      Installation

      The extension is installed in a short, tightly planned on-site phase.

    7. 07

      Handover and aftercare

      We review the work, documentation and guarantee after completion.